Mtbm near me made in China replacement parts in Hargeysa Somalia Xdn 1400 Rock EPT rotunnel Boring Machine for Concrete Pipes with top quality

Mtbm near me made in China  replacement parts  in Hargeysa Somalia Xdn 1400 Rock EPT rotunnel Boring Machine for Concrete Pipes with top quality

We – EPG Group the most significant gearbox & motors , couplings and gears factory in China with 5 distinct branches. For far more specifics: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828

Principal Elements Manufacturer :

No. Component Title Brand name
1 Gear Reducers Dinamic/ Bonfiglioli
2 PLC program controller MITSUBISHI,Japan
3 Touch Display MITSUBISHI,Japan
four Steering Solenoid valve BMEG,Germany
5 Hydraulic valve BMEG,Germany
6 Main Electrical factors Schneider
seven Pressure oil pump ZheJiang shenfu
eight Electric motor Siemens
nine Main axle substance 42CrMo
10 Alloy cutter substance Tungsten carbide YG11
eleven Shell content Q235

 

Primary Complex Specification
No. Product OD*L Principal Power Rectify technique Oil cylinder thrust Greatest torque of Slicing Head (KN.M) Rpm of Chopping Head (r/min) Oil cylinder thrust of Principal Equipment Strain of oil cylinder(Mpa) Discharge Pipe Measurement (mm)
1 JR500 Φ695*2950 22*1 220KN*4 15.3 thirteen.seven 200T*two 31.5 Φ75
two JR600 Φ795*2840 22*1 310KN*4 15.three thirteen.seven 200T*two 31.five Φ75
3 JR800 Φ980*4400 thirty*1 550KN*5 57 5 200T*2 31.5 Φ100
four JR1000 Φ1220*4400 fifteen*3 480KN*4 89 3.two 200T*2 31.five Φ100
5 JR1200 Φ1460*3800 18.5*three 630KN*4 177 2.7 200T*2 31.five Φ100
/22*three
6 JR1350 Φ1640*4500 22*3 630KN*four 177 two.7 200T*2 31.5 Φ125
7 JR1500 Φ1820*5000 30*three 630KN*four 276 2.seven 200T*2 31.five Φ125
/1600 /Φ2000*5000
8 JR1800 Φ2180*5000 30*four 800KN*eight 415 2.5 200T*four 31.5 Φ125
/2000 /Φ2420*5000 200T*six
nine JR2200 Φ2660*5200 37*4 800KN*8 553 2.5 200T*six 31.five Φ150
ten JR2400 Φ2900*5600 30*6 990KN*eight 553 two.five 200T*six 31.5 Φ150
11 JR2600 Φ3160*5850 37*six 990KN*eight 837 2.five 200T*eight 31.5 Φ150
/2800 /Φ3350*5850
twelve JR3000 Φ3580*5900 37*8 1240KN*eight 1719 2.five 200T*eight 31.5 Φ150

Internal Construction :

Crushing Head Particulars :

Main Axis and Gear Reducers  Details :

Electric powered Cabinet Details :

Engineering Case :

Item Description :
Pipe Jac ept Equipment 2000mm created for massive pipe jac ept engineering , generally employed in the development of cement pipe crossings, building homes translation, sewers, roadways and rivers as a sheathing of other tasks throughout a variety of channels.

Theory :
Pipe jac ept design is in the operate in the pit ,by means of jac ept Machine which create jac ept pressure, and conquer the friction between the pipes and the bordering soil.
Jac ept the pipes Into the soil at the layout slope.and Eliminated soils .
Following a section of pipe complete jac ept into the soil , then the second area of the pipes proceed to jack into the soil , The basic principle is by signifies of the thrust of the primary cylinder    pipeline, intermediate jac ept station,and other thrust pushing the instrument pipe or heading machine (via the soil )from wor ept nicely to the getting nicely and Lift up. Then , embed the pipes between the two wells.
 
Main Attributes:
Whole Section rock earth stress screen method.
The divided one grouting technique for cutter panel and spindle heart.
The rear of jac ept pipe equipment geared up with jac ept device and avert deviation system.
Disk cutter adopts famous China brand.
Planetary gearbox adopts Italian BREVINI.
Undertake touch screen, PLC Inverter and other advanced manage method.
The knowledge exhibited on the touch display can be related to users  office keep an eye on via RS232 interface.

Advantage :
The edge of this strategy is no excavation on the ground,Do not demolition,Does not wipe out the ground buildingsDon’t injury the setting,Does not impact pipeline section deformation,Time-saving, successful, protected, reduced general value.
The technological innovation are commonly utilized in city underground water supply and drainage pipeline,All-natural fuel pipeline,Communication cable and other non excavation laying.It can via the freeway, railway, bridge, mountains, rivers, channel and any building on the ground.The use of the engineering design, can help save a large amount of land acquisition and demolition fees,also can reduce environmental air pollution and street congestion,It has substantial financial and social rewards.

Wor ept Frequency :
one.Using in ROCK problem
two.Commonly used in Southeast Asian international locations, ZheJiang , and Japan.
three.Inside cement pipe dia from a thousand-3200 mm
4.Professional company who can produce ROCK pipe jac ept machine in China.
 
Packaging & Shipping :
Nude Packing
Shipping Detail:
60 times following 30% deposit obtaining
 
Our Services :
 We will send expert technician to your project internet site to function the pipe jac ept equipment and teach operators for the undertaking,  
one.On site service assist
two. 12month warranty
three.Existence time services help,
4. 7 days*24hours Hot-line & Email Service. 
5.Your inquiry related to our pipe jac ept device will be replied inside of 24 hrs.Well-qualified and seasoned workers will solution all your concerns in fluent English.
 
Guarantee :
If quality & assembling dilemma caused difficulties, we get accountable on spare components and all service charges.
If misuse or human elements caused the difficulties, customers shall take responsible on spare parts and all provider expenses.

Chinese Patent of Compund Pipe Jac ept Machine

1.Introduction to Equipment Performance
A.The total device is water-resistant (Chinese patent number ZL201822154528.).
B.By getting rid of the crushing wheel and the attachment of cutter head ,  this  machine can be remoulded to the panel machine which is far more efficient  for silty clay layer construction and the device can be remoulded in the construction web site.(components included)
C.There is no require to return to the manufacturing unit.By replacing the rock cutter head on the website and connecting the entrance keep track of, the rock machine required for pure rock geology can be shaped (bought separately).
D.In accordance to a lot of several years of design experience, we mixed with true wor ept problems.We  developed digital integrated manage method independently, that can management the  pump and valve group components integratedly throughout the whole design method.Also, the complete method of construction  can be hassle-free, straightforward, secure and reliable.

two. Geological problems relevant to factory products (patent application quantity 201915715.4)
A.It is appropriate for pebble layer, sand pebble layer, soil pebble layer with particle dimensions <= 30% of its own pipe diameter.
B.Miscellaneous filling layer (no metal bar, massive amount of non-degradable soft domestic rubbish), simple filling layer
C.Suited for all kinds of tough non-strongly cohesive soil layers with uniaxial compressive toughness <= 10MPa
D.Mixed with soil advancement media to adapt to various sand layers

three.Particular Style
Energy technique of the gear , correction system of the pumping station, bypass technique, pressure checking program and manage system can all be created for intercommunication of adjacent pipe diameters.Illustration:Ø800 and Ø1000 can be shared

The Variation of Chopping Head of Compound Pipe Jac ept Equipment

Venture Situation :

Shipping and delivery data and services after sell :

1)PAYMENT Terms:
T/T :30% as ept payment and T/T 70% paid before shipment
two) DELIVERY  :
thirty days following receipt of 30% ept payment
3 )Service Right after Market:
Electrical power box, motor, reducer box warranty interval is one yr, throughout this 1 calendar year support , non-human or unnatural disasters which led to any problems, we provide totally free maintenance provider to buyer’s Design Site.
Hydraulic program, electrical technique warranty time period is 6 months, This sort of as human aspects guide to any troubles and need to substitute with new one particular, we will market the Hydraulic and electrical parts at our cost price tag , buyer will bear the cost of Hydraulic and electrical areas and Intercontinental convey costs.
After the machine arrived at your Construction site, we will deliver 2 machine operators whose salary is USD200/working day, kindly also give our people ‘s place and foods and round trip air tickets during the time period of building.

The use of first gear manufacturer’s (OEM) element quantities or logos , e.g. CASE® and John Deere® are for reference needs only and for indicating product use and compatibility. Our company and the listed replacement areas contained herein are not sponsored, accepted, or produced by the OEM.

Mtbm near me made in China  replacement parts  in Hargeysa Somalia Xdn 1400 Rock EPT rotunnel Boring Machine for Concrete Pipes with top quality

Mtbm near me made in China  replacement parts  in Hargeysa Somalia Xdn 1400 Rock EPT rotunnel Boring Machine for Concrete Pipes with top quality